Kitchen Renovation: what it costs in the GTA (2026)
Planning estimates for your budget - a written quote confirms the scope, materials and site conditions.
| Scope | Typical 2026 range |
|---|---|
| Repairs | $8,000–$18,000 |
| typical full kitchen renovation | $25,000–$65,000 |
Repairs/refresh = counters, backsplash and paint-grade updates.
Our own work
Photographs from jobs this crew actually did - not stock.






Get my free kitchen quote⚡ Try the calculator1-800-675-1055
What does a kitchen renovation cost in Toronto in 2026?
Full renovations typically run $25,000–$65,000. Cabinet grade and layout changes drive most of the spread.
How long does a kitchen take?
Four to eight weeks once materials are on site. Winter installs often finish fastest - the crew works indoors, uninterrupted.
What’s the work triangle?
Sink, stove and fridge should total under 26 feet of walking path. Getting the layout right matters more than any finish.
Can I keep my layout and still get a new kitchen?
Yes - keeping plumbing and gas in place is the single biggest money saver.
How much does a kitchen renovation cost in Toronto?
A full kitchen renovation in Toronto runs $25,000–$65,000 depending on scope - cosmetic refreshes (counters, paint, cabinet refacing) at the bottom, full guts with new cabinets and layout changes at the top. In older neighbourhoods like Riverdale, Leaside, or The Beaches, expect extra line items once walls are open - knob-and-tube wiring, galvanized supply lines, or old water damage are common in 1920s–40s housing stock, and we price those separately after the walkthrough rather than hiding them in the quote. Layout or plumbing changes require a city permit, which we handle for you and pass through at the City's posted fee with no markup. Once demo starts, most kitchens take four to eight we
How much does a kitchen remodel cost in Toronto?
In Toronto, a cosmetic refresh - keeping the layout, swapping cabinets, counters, and finishes - typically runs $15,000–$30,000 over 2–4 weeks; a mid-range remodel with semi-custom cabinets and some layout changes lands between $30,000 and $60,000 over roughly 6–10 weeks; and a full gut with new plumbing, electrical, and high-end finishes starts around $60,000, can exceed $100,000, and often takes 10–16 weeks including permit time. Any work touching plumbing, electrical, or structure needs permits and an ESA electrical inspection in Toronto, so build in a few weeks for approvals before demo starts. Older Toronto homes also tend to hide knob-and-tube wiring, galvanized plumbing, or asbestos in pr
How much does a kitchen renovation cost in Toronto?
A full kitchen renovation in Toronto typically runs $25,000 to $65,000 depending on size, cabinet quality, and how much plumbing or electrical moves are involved. What the range doesn't show is how your neighbourhood changes the surprises: older downtown homes in areas like Cabbagetown or Roncesvalles often hide knob-and-tube wiring, undersized galvanized drains, and ceilings too low for recessed lights, while 1950s North York and Etobicoke bungalows frequently need asbestos testing before we touch old drywall or ducts. We pull the electrical and plumbing permits for you either way, and every quote is itemized so you can shift finishes to hit your number.
Customer-record counts are not completed-project totals and have no recency filter.
